Attiki Odos: a third lane at the Pallini junction and a link from the Rafina branch to the airport are among the ten measures in the new study
The supplementary environmental study for the Attica Motorway, which is currently under consultation, proposes an additional lane over a 1.3 km stretch in Pallini, a fourth lane over a 6.3 km stretch as far as Metamorfosi, and pollution control units for the Rafina and Vravrona streams. No decisions or timetable have been finalised.
· Automatic translation
Read more →












